[1]
|
Liu Min. A survey of data-based production scheduling methods. Acta Automatica Sinica, 2009, 35(6): 785-806 (刘民. 基于数据的生产过程调度方法研究综述. 自动化学报, 2009, 35(6): 785-806)
|
[2]
|
Daniels R L, Kouvelis P. Robust scheduling to hedge against processing time uncertainty in single-stage production. Management Science, 1995, 41(2): 363-376
|
[3]
|
Gupta S K, Kyparisis J. Single machine scheduling research. Omega, 1987, 15(3): 207-227
|
[4]
|
Webster S, Baker K R. Scheduling groups of jobs on a single machine. Operations Research, 1995, 43(4): 692-703
|
[5]
|
Yan Yang, Wang Da-Zhi, Wang Ding-Wei, Ip W H, Wang Hong-Feng. Single machine group scheduling problems with the effects of deterioration and learning. Acta Automatica Sinica, 2009, 35(10): 1290-1295
|
[6]
|
Zhao Yu-Fang, Tang Li-Xin. Scheduling with agreeable release times and due dates on a single continuous batch processing machine. Acta Automatica Sinica, 2008, 34(8): 957-963 (赵玉芳, 唐立新. 释放时间和工期同序的单机连续型批调度问题. 自动化学报, 2008, 34(8): 957-963)
|
[7]
|
Herrmann J W. Rescheduling strategies, policies, and methods. Handbook of Production Scheduling, 2006, 89: 135-148
|
[8]
|
Inderfurth K, Kovalyov M Y, Ng C T, Werner F. Cost minimizing scheduling of work and rework processes on a single facility under deterioration of reworkables. International Journal of Production Economics, 2007, 105(2): 345-356
|
[9]
|
Sarker B R, Jamal A M M, Mondal S. Optimal batch sizing in a multi-stage production system with rework consideration. European Journal of Operational Research, 2008, 184(3): 915-929
|
[10]
|
Haji R, Haji B. Optimal batch production for a single machine system with accumulated defectives and random rate of rework. Journal of Industrial and Systems Engineering, 2012, 3(4): 243-256
|
[11]
|
Wu S D, Storer R H, Chang P C. A rescheduling procedure for manufacturing systems under random disruptions. In: New Directions for Operations Research in Manufacturing. Berlin, Germany: Springer, 1992. 292-308
|
[12]
|
Unal A T, Uzsoy R, Kiran A S. Rescheduling on a single machine with part-type depend setup times and deadlines. Annals of Operations Research, 1997, 70: 93-113
|
[13]
|
Hall N G, Potts C N. Rescheduling for new orders. Operations Research, 2004, 52(3): 440-453
|
[14]
|
Hall N G, Liu Z X, Potts C N. Rescheduling for multiple new orders. INFORMS Journal on Computing, 2007, 19(4): 633-645
|
[15]
|
Yuan J J, Mu Y D. Rescheduling with release dates to minimize makespan under a limit on the maximum sequence disruption. European Journal of Operational Research, 2007, 182(2): 936-944
|
[16]
|
Yang B B. Single machine rescheduling with new jobs arrivals and processing time compression. The International Journal of Advanced Manufacturing Technology, 2007, 34(3): 378-384
|
[17]
|
Zhao C L, Tang H Y. Rescheduling problems with deteriorating jobs under disruptions. Applied Mathematical Modelling, 2010, 34(1): 238-243
|
[18]
|
Hoogeveen H, Lenté C, T'kindt V. Rescheduling for new orders on a single machine with setup times. European Journal of Operational Research, 2012, 223(1): 40-46
|
[19]
|
Chu C B. A branch-and-bound algorithm to minimize total flow time with unequal release dates. Naval Research Logistics, 1992, 39(6): 859-875
|
[20]
|
Graham R L, Lawler E L, Lenstra J K, Rinnooy Kan A H G. Optimization and approximation in deterministic sequencing and scheduling: a survey. Annals of Discrete Mathematics, 1979, 5: 287-326
|
[21]
|
Kellerer H, Tautenhahn T, Woeginger G J. Approximability and nonapproximability results for minimizing total flow time on a single machine. In: Proceedings of the 28th Annual ACM Symposium on Theory of Computing. New York, NY, USA: ACM, 1996. 418-426
|
[22]
|
Chu C. Efficient heuristics to minimize total flow time with release dates. Operations Research letters, 1992, 12(5): 321-330
|