[1]
|
Zhao X B, Ohno K. Algorithms for sequencing mixed models on an assembly line in a JIT production system. Computers and Industrial Engineering, 1997, 32(1): 47-56[2] Smith K, Palaniswam M, Krishnamoorthy M. Traditional heuristic versus Hopfield neural network approaches to a car sequencing problem. European Journal of Operational Research, 1996, 93(2): 300-316[3] Yano C A, Rachamadugu R. Sequencing to minimize work overload in assembly lines with product options. Management Science, 1991, 37(5): 572-586[4] Sarker B R, Pan H. Designing a mixed-model assembly line to minimize the costs of idle and utility times. Computers and Industrial Engineering, 1998, 34(3): 609-628[5] Sarker B R, Pan H. Designing a mixed-model, open-station assembly line using mixed-integer programming. Journal of Operational Research Society, 2001, 52(5): 545-558[6] Yan Hong-Sen, Xia Qi-Feng, Zhu Min-Ru, Liu Xia-Ling. Approaches to simultaneous production planning and scheduling in automobile assembly workshops. Acta Automatica Sinica, 2002, 28(6): 911-919(严洪森, 夏琦峰, 朱旻如, 刘霞玲. 汽车装配车间生产计划与调度的同时优化方法. 自动化学报, 2002, 28(6): 911-919)[7] Tavakkoli-Moghaddam R, Rahimi-Vahed A R. Multi-criteria sequencing problem for a mixed-model assembly line in a JIT production system. Applied Mathematics and Computation, 2006, 181(2): 1471-1481[8] Tsai L. Mixedmodel sequencing to minimize utility work and the risk of conveyor stoppage. Management Science, 1995, 41(3): 485-495[9] Fattahi P, Salehi M. Sequencing the mixed-model assembly line to minimize the total utility and idle costs with variable launching interval. The International Journal of Advanced Manufacturing Technology, 2009, 45(9-10): 987-998[10] Becker C, Scholl A. Balancing assembly lines with variable parallel workplaces: problem definition and effective solution procedure. European Journal of Operational Research 2009, 199(2): 359-374[11] Boysen N, Kiel M, Scholl A. Sequencing mixed-model assembly lines to minimize the number of work overload situations. International Journal of Production Research, 2010, 49(16): 4735-4760[12] Birbil S I, Fang S C. An electromagnetism-like mechanism for global optimization. Journal of Global Optimization, 2003, 25(3): 263-282[13] Birbil S I. Stochastic Global Optimization Techniques [Ph.D. dissertation], North Carolina State University, USA, 2002[14] Wang Xiao-Juan, Gao Liang, Chen Ya-Zhou. Electromag- netism-like mechanism with its application. Application Research of Computers, 2006, 23(6): 67-70(王晓娟, 高亮, 陈亚洲. 类电磁机制算法及其应用. 计算机应用研究, 2006, 23(6): 67-70)[15] Han Li-Xia, Wang Yu-Ping. Electromagnetism-like mechanism algorithm for unconstrained optimization problem. Acta Electronica Sinica, 2009, 37(3): 664-668(韩丽霞, 王宇平. 求解无约束优化问题的类电磁机制算法. 电子学报, 2009, 37(3): 664-668)[16] Gao Liang, Wang Xiao-Juan, Wei Wei, Chen Ya-Zhou. A modified algorithm for electromagnetism-like mechanism. Journal of Huazhong University of Science and Technology (Natural Science), 2006, 34(11): 4-6(高亮, 王晓娟, 魏巍, 陈亚洲. 一种改进的类电磁机制算法. 华中科技大学学报(自然科学版), 2006, 34(11): 4-6)[17] Mirabi M, Fatemi Ghomi S M T, Jolai F, Zandieh M. Hybrid electromagnetism-like algorithm for the flowshop scheduling with sequence-dependent setup times. Journal of Applied Sciences, 2008, 8(20): 3621-3629[18] Tang Li-Xin, Zhao Ren. A new enhanced-dynasearch and TS for the pickling-rolling scheduling problem. Acta Automatica Sinica, 2010, 36(2): 304-313(唐立新, 赵任. 强化Dynasearch/TS算法求解酸轧生产调度问题. 自动化学报, 2010, 36(2): 304-313)
|