[1]
|
Zhang Chang-Sheng, Sun Ji-Gui, Yang Qing-Yun, Zheng Li-Hui. A hybrid algorithm for flowshop scheduling problem. Acta Automatica Sinica, 2009, 35(3): 332-336(张长胜, 孙吉贵, 杨轻云, 郑黎辉. 一种求解车间调度的混合算法. 自动化学报, 2009, 35(3): 332-336)[2] Zhang Hong-Yuan, Xi Yu-Geng, Gu Han-Yu. A decomposition and coordination scheduling method for flow-shop problem based on TOC. Acta Automatica Sinica, 2005, 31(2): 182-187(张宏远, 席裕庚, 谷寒雨. 基于约束理论的Flow-shop分解协调算法. 自动化学报, 2005, 31(2): 182-187)[3] Xu Zhen-Hao, Gu Xing-Sheng. Immune scheduling algorithm for flow shop under uncertainty with zero wait. Computer Integrated Manufacturing Systems, 2004, 10(10): 1247-1251(徐震浩, 顾幸生. 不确定条件下具有零等待的流水车间免疫调度算法. 计算机集成制造系统, 2004, 10(10): 1247-1251)[4] Yan Li-Jun, Li Zong-Bin, Wei Jun-Hu, Du Xuan. A new hybrid optimization algorithm and its application in job shop scheduling. Acta Automatica Sinica, 2008, 34(5): 604-608(闫利军, 李宗斌, 卫军胡, 杜轩. 一种新的混合优化算法及其在车间调度中的应用. 自动化学报, 2008, 34(5): 604-608)[5] Xiong He-Gen, Li Jian-Jun, Kong Jian-Yi, Yang Jin-Tang, Jiang Guo-Zhang. Heuristic method for dynamic job shop scheduling problem with operation relativity. Chinese Journal of Mechanical Engineering, 2006, 42(8): 50-55(熊禾根, 李建军, 孔建益, 杨金堂, 蒋国璋. 考虑工序相关性的动态Job shop调度问题启发式算法. 机械工程学报, 2006, 42(8): 50-55)[6] Wei Ying-Zi, Zhao Ming-Yang. A reinforcement learning-based approach to dynamic job shop scheduling. Acta Automatica Sinica, 2005, 31(5): 765-771(魏英姿, 赵明扬. 一种基于强化学习的作业车间动态调度方法. 自动化学报, 2005, 31(5): 765-771)[7] Xie Zhi-Qiang. Study on Operation Scheduling of Complex Product with Constraint among Jobs [Ph.D. dissertation], Harbin University of Science and Technology, China, 2009(谢志强. 工件间有约束的复杂产品工序调度研究 [博士学位论文], 哈尔滨理工大学, 中国, 2009)[8] Xie Zhi-Qiang, Liu Sheng-Hui, Qiao Pei-Li. Dynamic job-shop scheduling algorithm based on ACPM and BFSM. Journal of Computer Research and Development, 2003, 40(7): 977-983(谢志强, 刘胜辉, 乔佩利. 基于ACPM和BFSM的动态Job-Shop调度算法. 计算研究与发展, 2003, 40(7): 977-983)[9] Xie Z Q, Ye G J, Zhang D L, Tan G Y. New nonstandard job shop scheduling algorithm. Chinese Journal of Mechanical Engineering, 2008, 21(4): 97-100[10] Xie Zhi-Qiang, Mo Tao, Tan Guang-Yu. Dynamic job-shop scheduling algorithm of the non-close-joining operations. Chinese Journal of Mechanical Engineering, 2008, 44(1): 155-160(谢志强, 莫涛, 谭光宇. 非紧密衔接工序动态车间调度算法. 机械工程学报, 2008, 44(1): 155-160)[11] Xie Zhi-Qiang, Shao Xia, Yang Jing. Algorithm for integrated flexible scheduling with device-independence deferred constraint. Journal of Mechanical Engineering, 2011, 47(4): 177-185(谢志强, 邵侠, 杨静. 存在设备无关延迟约束的综合柔性调度算法. 机械工程学报, 2011, 47(4): 177-185)[12] Xie Zhi-Qiang, Li Zhi-Min, Hao Shu-Zhen, Tan Guang-Yu. Study on complex product scheduling problem with no-wait constraint between operations. Acta Automatica Sinica, 2009, 35(7): 983-989(谢志强, 李志敏, 郝淑珍, 谭光宇. 工序间存在零等待约束的复杂产品调度研究. 自动化学报, 2009, 35(7): 983-989)[13] Xie Zhi-Qiang, Teng Yu-Zheng, Yang Jing. Integrated scheduling algorithm with no-wait constraint operation group. Acta Automatica Sinica, 2011, 37(3): 371-379(谢志强, 滕宇峥, 杨静. 紧密衔接工序组联动的综合调度算法. 自动化学报, 2011, 37(3): 371-379)[14] Xie Z Q, Hao S Z, Ye G J, Tan G Y. A new algorithm for complex product flexible scheduling with constraint between jobs. Computers and Industrial Engineering, 2009, 57(3): 766-772[15] Xie Zhi-Qiang, Yang Jing, Yang Guang, Tan Guang-Yu. Dynamic job-shop scheduling algorithm with dynamic set of operation having priority. Chinese Journal of Computers, 2008, 31(3): 502-508(谢志强, 杨静, 杨光, 谭光宇. 可动态生成具有优先级工序集的动态Job-Shop调度算法. 计算机学报, 2008, 31(3): 502-508)[16] Xie Zhi-Qiang, Yang Jing, Zhou Yong, Zhang Da-Li, Tan Guang-Yu. Dynamic critical paths multi-product manufacturing scheduling algorithm based on operation set. Chinese Journal of Computers, 2011, 34(2): 406-412(谢志强, 杨静, 周勇, 张大力, 谭光宇. 基于工序集的动态关键路径多产品制造调度算法. 计算机学报, 2011, 34(2): 406-412)[17] Yang Zhi-Yi, Yang Gang, Zhang Hai-Hui. An approach for implementing service-oriented and event-driven information integration platform. Journal of Computer Research and Development, 2008, 45(10): 1799-1806(杨志义, 杨刚, 张海辉. 一种面向服务的事件驱动架构信息集成平台构造方法. 计算机研究与发展, 2008, 45(10): 1799-1806)[18] Liu Jia-Hong, Wu Quan-Yuan. An event-driven service-oriented computing platform. Chinese Journal of Computers, 2008, 31(4): 588-598(刘家红, 吴泉源. 一个基于事件驱动的面向服务计算平台. 计算机学报, 2008, 31(4): 588-598)
|