基于准时制的炼钢-连铸生产调度问题研究
Research on Steelmaking and Continuous Casting Production Scheduling
-
摘要: 在钢铁CIMS下对于在安排炼钢-连铸调度中的机器冲突问题建立了基于准时制调 度思想的数学模型,经过变换,将非线性规划问题转化为线性规划问题,用标准线性规划程 序进行求解,使这一模型能够用于生产实际.最后给出了一个应用实例.Abstract: In this paper the JIT (just in time) idea based mathematical model is presented for solving machine conflict in steelmaking&continuous casting production scheduling under CIMS environment. By conversion strategy the non-linear programming model is converted into linear programming which can be solved by standard linear programming software. It is proved that this model can apply to actual production. An application example is given at the end.
计量
- 文章访问数: 2993
- HTML全文浏览量: 36
- PDF下载量: 1651
- 被引次数: 0